Client: New Hampton Hotel
Location: Kings Cross
Date: Mar 2014

A new 16-tap glycol chilling beer system and keg room including a beer pump/ post-mix system servicing 2 bars. The keg room was very restricted in space and access requiring the gas system and air compressor to be remotely located 40 metres away.