Client: Penrith Gaels Club
Location: Penrith
Date: Oct 2013

The original keg room fit-out had been altered and added to over the years leaving a mismatching set of equipment that was inefficient and difficult to operate. The new fit out featured all new fob traps and manifolds mounted on stainless steel panelling mounted in a uniform pattern combined with a modern beer pump system.The beer pump system includes an auxiliary air supply to run post-mix syrup pumps (replacing CO2 gas). Gas costs for both beer and post-mix have been reduced by 75% through this system.